Saturday, 26 April 2025

Tudan’s Phase 2 drainage upgrading underway

Facebook
X
WhatsApp
Telegram
Email
Lee surveying the drainage system upgrading project at Tudan Phase 2 on Monday (Feb 15). Photo: Ukas

LET’S READ SUARA SARAWAK/ NEW SARAWAK TRIBUNE E-PAPER FOR FREE AS ​​EARLY AS 2 AM EVERY DAY. CLICK LINK

MIRI: Works to upgrade the drainage system in Tudan Phase 2 are underway.

Transport Minister Datuk Lee Kim Shin said the project was implemented following the flash floods that occurred in December last year.

“The flash floods caused many areas in Tudan Phase 2 to be flooded. With the implementation of this project, it is expected that the irrigation and drainage system in Tudan will be improved in an effort to overcome flood incidences,” he said.

According to a report by the Sarawak Public Communications Unit (Ukas), the Senadin assemblyman said this after surveying the drainage system upgrading project at Tudan Phase 2 on Monday (Feb 15).

Other than Tudan Phase 2, Lee said the drainage system in all other Tudan areas would also be upgraded in the near future as a drastic measure to prevent floods.

Related News

Most Viewed Last 2 Days

SMRH-idris-right-2604-nvl (1)
Rights over natural resources not subject to dispute
mcmu myy-SOP logo-2604-mr p1
Sarawak Oil Palms unveils new logo to rebrand image
SBW-gerald voca-2604-avk
Career in TVET aligns with high-impact initiatives
MYY-rundi-fama-2604-nvl
FAMA Fest sets out to attract, reassure young farmers
MKH-royston-projects-2604-nvl-1
RM60mil waterfront among six projects in pipeline