Sunday, 27 April 2025

DID Miri clears two retention ponds

Facebook
X
WhatsApp
Telegram
Email
The excavator doing the clearing works at a retention pond.

LET’S READ SUARA SARAWAK/ NEW SARAWAK TRIBUNE E-PAPER FOR FREE AS ​​EARLY AS 2 AM EVERY DAY. CLICK LINK

The excavator doing the clearing works at a retention pond.

MIRI: Drainage and Irrigation Department Miri has immediately cleared the retention ponds after being requested by Assistant Minister of Tourism, Art and Heritage Datuk Lee Kim Shin.

Lee said, after receiving flash flood report from public, he asked the DID to clear the retention pond.

“I have asked DID to immediately clear the retention ponds. Other short term remedial works will also be carried out,” he told reporters.

He said, two retention ponds had been cleared, namely one in Riam Jaya Eco park and one in Taman Lopeng.

He disclosed, another short term remidial works also will be carried out.

Related News

Most Viewed Last 2 Days

2-worldbank
Growth drops to 3.9 pct, losing ground to neighbours
World Bank Spring Meetings In Washington DC
Bessent not wrong on China
MALAYSIA-CHINA-DIPLOMACY
Overcoming AI chip gap no longer optional
1-Real
Punching through the middle-income ceiling
WhatsApp Image 2025-04-25 at 14.02
Humanity on trial