School’s flood mitigation project done ahead of schedule

Facebook
X
WhatsApp
Telegram
Email
The completed project at SK Ulu Meradong

LET’S READ SUARA SARAWAK/ NEW SARAWAK TRIBUNE E-PAPER FOR FREE AS ​​EARLY AS 2 AM EVERY DAY. CLICK LINK

SARIKEI: The flood mitigation project at Sekolah Kebangsaan (SK) Ulu Meradong, valued at RM147,915, has been completed ahead of schedule.

Repok assemblyman Datuk Seri Huang Tiong Sii, in a statement, said the Sarikei Drainage and Irrigation Department (DID) executed the project, which included cleaning and dredging a 980-metre long ditch.

Additionally, a 160-metre long concrete drainage system, measuring two feet in width and height, was constructed within the school premises to address flood issues.

The project’s timely completion was celebrated at a DID handover ceremony last Friday, attended by Gung Chiu Kion on behalf of Huang who is the Deputy Minister of Natural Resources, Environment and Climate Change and Sarikei MP.

Concurrently, a delegation from the Sarikei service centre, along with DID engineering representatives, conducted an inspection of the finished project.

Towards this end, Huang expressed his hope that students would now have a safer and more conducive learning environment at the school.

Acting promptly upon receiving the school’s request, he addressed the recurring flooding issue.

See also  Health screening tour Dec 10-19

Also present was DID assistant engineer Abdul Rashid.

Download from Apple Store or Play Store.